Denso Steelcoat Systems are divided into 4 categories which involve different surface preparation .i.e. Categories A,B, C, and D. For a summary of these categories please go to the bottom of this page or click here
Surface Preparation |
Protecting:
|
Steelcoat Systems |
Expected Service
Life (years) |
Average Thickness
(Microns) |
1st Maintenance
Coat (years) |
|
Steel Structures
rigs, jetty piles,
decking, walkways,
ramps, loading
installations,
very hot pipes
plant, tanks, pipelines,
cranes, bridges,
steelcoat
|
|
|
|
|
|
process plant,
pipe bridges,
structural steel,
pipework,
fittings,
pipelines,
tie bars,
storage tank bases,
metal roof purlins,
hot pipework
|
|
|
4-500
1600
1600
1400
1250
2300
(55% overlap)
|
|
|
cold/damp pipes,
badly rusted/pitted
pipes and
structural steelwork,
fittings,
pitted pipelines,
old metal roof sheets
|
|
|
|
|
|
pre-stressing and
post tensioning
bridge cables and
anchorage
|
|
50 plus |
sleeve/anchorage
completely filled
|
- |
|
|
|
|
|
Category A |
Abrasive water jetting or ultra high pressure water-jetting |
|
|
(also suitable for dry abrasive blasting)
Standard: Sa2½
Surface profile: 50-75 microns
flash rusting: suitable over visibly patchy flash rust |
|
|
|
Category B |
Fresh water wash down followed by a thorough hand/power tool cleaning |
|
|
Standard: St2 |
|
|
|
|
Category C |
Fresh Water washdown, heavy chipping hammers to remove heavy rust, thorough |
|
|
hand wire brushing to remove all loose scale and old coatings(conditions where St2 mechanical cleaning is not fully achievable due to condensation, deep pitting etc). |
|
|
|
|
Category D |
No cleaning required - new cables |
|
|
|
|
|
Detailed Surface Preparation Data must be referred to. |
|